Site checklist: torque verification for bolted busbar joints
A short checklist I use on site before energizing. It takes ten minutes and catches most of the problems that cause hot joints later.
Before you start
- Torque wrench calibrated within the last 12 months, certificate on file
- Correct torque value from the drawing or the bolt manufacturer's table
- Contact surfaces clean, no paint, no oxidation, no burrs
During torquing
- Tighten in a cross pattern, in two stages: first to 50%, then to 100%
- Use a Belleville washer under the nut if the drawing calls for one; it keeps the clamping force stable as the joint heats and cools
- Mark the bolt head and the nut with a paint pen after torquing, so a loose joint is visible at a glance on the next visit
Record
Write down the torque value, the wrench serial number, the date and your initials. A photo of the torque mark helps too. If a joint runs hot later, the first question is always "was it torqued correctly?" and the record answers it.